搜索
Search

Product Category

All categories

Product List

1/1
Number of views:
1000

Gangway Tower

Number of views:
1000
Product serial number
Quantity
-
+
1
产品描述

Gangway Tower is a device for operators of working at site and crews to pass through board and off-board safely in the process of oil tanker's berthing at large modern harbor. It instead of traditional boarding device.
 

During the development of the oil tanker harbor, the modern dock for heavy oil tanker entering, especially the dock sets up with isolated mound, its surface aren’t continuous and its elevation is higher than normal one. The oil tanker has serious jouncing, floating in higher frequency and its scope is very big during the oil tanker is moored. The problem is hard to be solved easily by the tanker’s own ladder because of  the distance between oil tanker and the edge of dock. To speed up the loading and unloading process and to ensure the safety of the loaders and crews, it is natural for the modern large oil tanker to replace own ladder with our Gangway Tower. Just like Loading Arm, Gangway Tower becomes irreplaceable advanced equipment being used more and more harbors.
 

Although having simple function, Gangway Tower needs good technological performance considering its surrounding circumstance. In order to suit the queasy condition and some unexpected things between ship and dock, the harbor’s hydrology and meteorology and a lot of detail information relevant possible berthing ships should be analyzed carefully, to decide its suitable working conditions and choose correct construction and reliable safeguard. Only alone doing so, we can get the anticipative purpose.
 

There are several models of boarding ladders manufactured by SEED.
 

The boarding ladder consists of a standing column, accommodation ladder and other supplementary constructions. The accommodation ladder even has the function of up and down, bending, turning around, and the adjustment of the front ladder.
 

Mechanical or hydraulic drive system is usually used as drive system for Gangway Tower. Many kinds of safe protector can be set according to client’s requirement in order to ensure the normal work of transmission mechanism. Explosive-proof electric-device can also be used base on the flash point of the oil.

 

 

Selection guide for Gangway Tower

The selection of Gangway Tower is mainly according to dock tonnage, tidal variation, jetty surface situation, cost performance, etc. Users must fill in the parameters form and submit to manufacturer for determining the envelope scope base on the dimension and load data of Gangway Tower.

 

EBL - E1 consists of main ladder, deck ladder and frame. Which is applicable of 3000DWT ~ 30000 DWT Jetty.

 

EBL-E2 consists of main ladder, front ladder, deck ladder, rotatable platform and upright post. Which is applicable of 5000DWT ~ 50000 DWT Jetty.

 

EBL-E3 consists of main ladder, front ladder, deck ladder, rotatable platform, hydraulic mechanism and upright post. Which is applicable of 10000DWT ~ 80000 DWT Jetty.

 

EBL-E4 consists of main ladder, front ladder, triangle ladder, rotatable platform, lifting mechanism, and tower. Rotating mechanism can go up and down along tower. Which is applicable of 20000DWT~450000 DWT Jetty..

 

 

Main features:

● Aluminium alloy hanging ladder, alterable steps mechanism

● Hydraulic control luffing and rotating system

● Wireless remote control

● Various kinds of models to satisfy with site condition

 

Ordering parameters of Gangway Tower

Description

Data

Type

 

Design ship type

max T/min T

Dock elevation

m

Design /extreme high water level

m / m

Design/ extreme low water level

m / m

Distance between edge of jetty and center of Gangway Tower

m

Thickness of dock fender

m

Distance between datum surface of tower bottom base and dock surface

m

Site power

380v 50Hz 3phases 5lines

Explosive-proof grade

 

Control mode

 

Maximum design wind speed

m/s

 

 

 

 

 

We could not find any corresponding parameters, please add them to the properties table

Copyright © Shanghai Guanzhuo Offshore Engineering Co., Ltd. Address: Building 5, No. 2000 Weiqing East Road, Jinshan District, Shanghai
Contact number: +86 21-67251696 Post code: 201508

《 The People's Republic of China Telecommunications and Information Service Business License 》 No . 沪ICP备05057580号 Power by : www.300.cn 

Links  | Iran offshore Co. (IOC)   Denmark IH-Marine   LEXXON EQUIPMENT   India-United Engineering Agencies    Malaysia FORWELL O & G SDN BHD   Kuwait-JSGroup